Wednesday, April 20, 2011

Front Deck finished

At last the front Deck is finished, now I just need to get on with the garden.

The deck as you can see in the photos now has an extra post in the front, I was not going to pay the builder $2000 to install a post that cost us $128.00 and 2 hours for Stephan and me to install.


  As you can see in this photo, The edge is what call a raw edge. All the boards were from recycled timber 200x45, so they all need to be dressed, routed, cut, predrilled and then finally painted before being screwed into place.  Then they were oiled once in place. It took a lot of work and a lot long then planned to do. We are using the same process for the front garden, Oh and the Mailbox is the same as the deck. The neighbours are impressed and it looks like a very expensive job but it cost less then $1000 to do.

Now the garden design is coming together. we aiming for the bushy Australian look. Post, stones and rail all black except for the only colour coming from the garden plants. Lets see how that comes along.


No comments: